تعداد و مشخصات مقالات ISI سال 2008 و 2009
نام نویسنده ( * ) | عنوان مجله | عنوان مقاله | ردیف | |
2009 | M.Esmaeili, Mir-Bahador Aryanaezhad , P.Zeephongsekui | European Journal of Operational Research | A game theory approach in seller- buyer supply chain | 1 |
2009 | Arshia Ahi,Mir.B.Aryanezhad, Behzad Ashtiani, Ahmad Makui | Computer & operations Research | A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method | 2 |
2008 | Mehdi ghazanfar i,Adel Alaeddini, SeyedTahi Akhavan Niaki , Mir-Bahador Arynezhad | Quality and Reliability Engineering International | A Clustering Approach to Identify the time of a step change in shewhart control charts | 3 |
2009 | Rassoul Noorossana and Alireza Shadman | Quality And Reliability Engineering International | Estimating the Change point of a Normal Process Mean with a Monotonic Change | 4 |
2009 | V.R.Ghazavati, M.S.Jabal-Ameli, A.Makui | Expert systems with Applications | A new heuristic method for distribution networks considering service level constraint and coverage radius | 5 |
2008 | Ramin Sadeghian and Gholam Reza Jalali-Naini | Dynamics of Continuous Discrete and Impulsive Systems | Applying Semi-Markov Models For Forecasting the Triple Dimensions of Next Earthqu AKE occurrences | 6 |
2009 | R.Tavakkoli-Moghaddam, A.Makui, S.Salahi, M.Bazzazi, F.Taheri | Computer & Industrial engineering | An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports | 7 |
2009 | M.K.Ardakhani, R.Noorassana, S.T.Akhavan niaki, H-Lahijanian | Inter.J. of applied mathematics and computer science | Robust parameter design using the weighted metric method- the cost of the smaller the better | 8 |
2008 | Mohammad Fathian , Seyed J.Sadjadi, Samaneh Sajadi | Computers & Industrial Engineering | Optimal Pricing model for electronic Products | 9 |
2008 | S.J.Sadjadi , H.Omrani | Energy Policy | Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies | 10 |
2009 | Fardin Ahmadizar, Mehdi Ghazanfari , seyed Mohammad Taghi Fatemi Ghomi | Int J Adv Manuf Technol | Applictioan of chance-constrained programming for stochastic group shop scheduling problem | 11 |
2009 | S.J.Sadjadi, M.Jafari, T.amini | Int J Adv Manuf Technol | A new mathematical modeling and a genetic algorithm search for milk run problem (an auto industry supply chain case study ) | 12 |
2009 | M.Saidi Mehrabad , A..Pahlavani | Int J Adv Manuf Technol | A Fuzzy multi-objective programming for scheduling of weighted jobs on a single machine | 13 |
2008 | Mohammad Saeed Jabal Ameli , Jamal Arkat, Farnza Barzinpour | Int J Adv Manuf Technology | Modeling the effects of machine breakdowns in the generalized cell formation problem | 14 |
2008 | Mohammad Fthian, Babak Amiri | Int J.Adv Manuf Technol | A honeybee- mating approach for cluster analysis | 15 |
2009 | R.Fekri, A.Aliahmadi, M.Fathian | Int J.Adv Manuf Technol | predicting a model for agile NPD Process with fuzzy cognitive map | 16 |
2009 | Hassan rezazadeh, Mehdi Ghazanfari, Mohammad Saidi-Mehrabad , SeyedJafar Sadjadi | Journal of zhejang University Science | An extended discrete particle swarm optimization algorithm for the dynamic facility layout problem | 17 |
2008 | Seyed Mohammad Seyed Hoseini, Simak Noori , Mohammad Ali Aatefi | Kuwait Journal of Science & Engineering | An Integrated decision support system for project risk response planning | 18 |
2008 | Majid Sabzehparver, S.Mohammad Seyed-Hosseini | J Supercomputer | A mathematical model for the multi- mode resource-constrained project scheduling problem with mode dependent time lags | 19 |
2007 | S.Ghazinoory, A.Aliahmadi, S.Namdarzangeneh, S.H. Ghodsypour | Applied Mathematics and computation | Using AHP and L.P. for choosing the best alternatives based the gap analysis | 20 |
2008 | Mohammad Fathian , Peyman Akhavan, Maryam Hoorali | Technovation | E-readiness assessment of non-profit ICT SMEs in a developing country: the case of Iran | 21 |
2008 | S.noori, M.R.Feylizadeh, M.Bagherpour, and R.M.Parkin | J. Engineering Manufacture | Optimization Of material requirement planning by fuzzy multi-objective linear programming | 22 |
2008 | S.Noori, M.Bagherpour, F.Zorrialssatine, A.Makui, and R.Parkin | J. Engineering Manufacture | A New Project scheduling approach for improving multi-product multi-period production planning problems | 23 |
2009 | Mohammad kazem sayadi, Majeed Heydari, Kamran Shahanaghi | Applied Mathematical Modeling | Extension of VIKOR method for decision making problem with interval numbers | 24 |
2009 | Seyed Mohammad Seyedhoseini , Siamak Noori, and Mohammad ali Hatefi | Risk Analysis
| An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions | 25 |
2009 | R.Khosravanian, M.B.Aryanezhad, A.Makui, B.S.Aadnoy , A.Naderifar | Oil And Gas Journal | Modeling optimizes casing points in Persian gulf wells | 26 |
2009 | Behzad Ashtiani, Farzad Haghighirad, Ahmad Makui, Golam ali Montazer | Applied soft computing | Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets | 27 |
2009 | Ata Allah Taleizadeh , Seyed Taghi Akhavan Niaki , Mir-Bahador Aryanezhad | Mathematical and Computer Modelling | A hybrid method of Pareto , TOPSIS and Genetic algorithm to optimize multi-Product multi-constraint inventory control systmes with random fuzzy replenishments | 28 |
تعداد و مشخصات مقالات ISI از تاریخ 1/1/2007 تا 20 مارس 2008 در سال 1386
ردیف |
عنوان مقاله | نام مجله | نام نویسنده | سال و ماه انتشار |
1. | A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system | European Journal of Operational Research | نیما صفایی- محمد سعیدی مهرآباد- محمدسعید جبل عاملی | Vol. 185 2008 |
2. | A general framework for multiresponse optimization problms based on goal programming | European Journal of Operational Research | رضا کاظم زاده- مهدی بهشتی- رسول نورالسناء | Vol. 189 2008 |
3. | A fuzzy programming approach for a cell formation problem with dynamic and uncertain conditions | Fuzzy sets and system | نیما صفایی- محمد سعیدی مهرآباد- رضا توکلی مقدم- فرخ صمیمی | Vol 159 2007 |
4. | The Development of an expert system for effective selection and appointment of the jobs applicants in human resource management | Computer & industrial engineering | محمد سعیدی مهرآباد- محمد فتحیان | Vol. 53 Issue. 2 2007 |
5. | On the conditional decision procedure for high yield processes | Computers& industrial engineering | رسول نورالسناء- عباس سقایی- کامران پی نبر- یاسر صمیمی | Vol. 53 2007 |
6. | An application of efficient frontier in transportation of hazardous materials | Computer & Industrial engineering | سیدجعفر سجادی | Vol. 53 2007 |
7. | Mathematical modelling and heuristic approaches to flexible job shop scheduling problems | Journal of Intelligent manufacuting | پرویز فتاحی- محمد سعیدی مهرآباد- فریبرز جولای | Vol.8 No.3 2007 |
8. | Designing cellular manufacturing systems under dynamic and uncertain conditions | Journal of Intelligent manufacturing | نیما صفایی- محمد سعیدی مهرآباد- مسعود باباخانی | Vol. 18 No. 3 2007 |
9. | A new model of dynamic cell formation by a neural approach | The International Journal of Advanced manufacturing Technology | محمد سعیدی مهرآباد-نیما صفایی | Vol. 33 Nos.9-10 2007 |
10. | A new method to fuzzy model ling and its application in performance evaluation of tenants in incubators | The International Journal of Advanced manufacturing Technology | محمد سعیدی مهرآباد- محمود رضایی صدرآبادی- ایمان محمدیان | Vol. 37 2007 |
11. | Joint pricing and lot sizing models with discount: A geometric programming approach | ANZIAM J. | مریم اسمعیلی- زینفگسکول- میربهادر قلی آریانژاد | Vol. 49 2007 |
12. | A new approach for the celluar manufacturing problem in fuzzy dynamic conditions by a genetic algorithm | Journal of intelligent & Fuzzy systems | توکلی مقدم- میربهادر قلی آریانژاد- صفائی- واسعی آزرون | Vol. 18 2007 |
13. | Partitioning machines intandem AGV systems based on “balanced flow strategy” by simulated annealing | Int J Adv Manuf Technol | توکلی مقدم- میربهادر قلی آریانژاد- کاظمی پور- صالحی پور | Vol. 70 2008 |
14. | Dynamic cell formation and the worker assignment problem: a new model | Int J Adv Manuf Technol | میربهادر آریانژاد- دلجو- میرزاپور- آل هاشم | Vol. 70 2008 |
15. | Designing safe job rotation schedules based upon workers’ skills | Int J Adv Manuf Technol | آریانژاد- خیرخواه- دلجو- میرزاپور- هاشمی | Vol. 70 2008 |
16. | An artificial neural network approach to multiple-response optimization | Int J Adv Manuf Technol | رسول نورالسناء- سام دوانلوتاجبخش-سقایی | Vol.5 2008 |
17. | A New optimization criterion for robust parameter design-the case of target is best | Int J Adv Manuf Technol | کمالی اردکانی- رسول نورالسناء | Vol.5 2008 |
18. | Cell formation with alternative process routings and machine reliability consideration | Int J Adv Manuf Technol | محمدسعید جبل عاملی- جمال ارکات | Vol. 35 2008 |
19. | Hybrid algorithms for the uncapacitated continuous location- allocation problem | Int J Adv Manuf Technol | محمدسعید جبل عاملی- عبدالسلام قادری | Vol. 37 2008 |
20. | Monitoring process variability using exponentially weighted moving sample variance control charts | Int J Adv Manuf Technol | مجید ایوزیان- جلالی نائینی- واقفی | Vol. 70 2008 |
21. | Phase I Monitoring of Ploynomial Profiles | Communications in statistics-Theory and Method | کاظم زاده- رسول نورالسناء-امیری | Vol. 37 2008 |
22. | On the Monitoring of Autocorrelated Linear Profile | Communications in statistics-Theory and Method | رسول نورالسناء- امیری- سلیمانی | Vol. 37 2008 |
23. | No- wait flow shop scheduling using fuzzy multi-objective linear programming | Journal of the Franklin Institute | بابک جوادی- سعیدی مهرآباد- علیرضا حاجی- ایرج مهدوی | Vol 185 2008 |
24. | Dynamic reliability networks with self-healing units | Reliability engineering & system safety | جناب- سیدحسینی- دیلون | Vol. 93 2008 |
25. | A mathematical model for the continuous time/ resource trade- off problem | KJSE | سیدمحمد سیدحسینی- سبزه پرور | Vol. 1 2008 |
26. | A gap analysis on the project risk management processes | KJSE | سیدمحمد سیدحسینی- سیامک نوری- محمدعلی هاتفی | Vol. 1 2008 |
27. | A hybrid system for multiobjective problems – A case study NP- hard problems | Knowledge – besad systems | محمدرضا غلامیان- مهدی غضنفری- سیدمحمدتقی فاطمی قمی | Vol. 20 2007 |
28. | Thermodynamic analysis of load-leveling hyper energy converting and utilization system | Energy | بهداد کیانی- آکیساوا- کافی واجی | Vol. 33 2008 |
29. | A new genetic algorithm for solving nonconvex nonlinear programming problems | Applied Mathematics and Computation | میربهادر قلی آریانژاد- محمد همتی | Vol. 199 2008 |
30. | Integrating goal programming, Kuhn-Tucker conditions, and penalty function approaches to solve linear bi-level programming problems | Applied Mathematics and Computation | روغنیان- سیدجعفر سجادی - میربهادر قلی آریانژاد | Vol. 195 2008 |
31. | A probabilistic bi-level linear multi-objective programming problem to supply chain planning | Applied Mathematics and Computation | روغنیان- میربهادر قلی آریانژاد- سیدجعفر سجادی | Vol. 188 2007 |
32. | The bullwhip effect and Lyapunov exponent | Applied Mathematics and Computation | احمد ماکوئی- علیرضا مددی | Vol 189 2007 |
33. | Comparing simulated annealing and genetic algorithm in learning FCM | Applied Mathematics and Computation | مهدی غضنفری-سمیه علیزاده- محمد فتحیان | Vol. 192 2007 |
34. | Application of honey-bee mating optimization algorithm on clustering | Applied Mathematics and Computation | محمد فتحیان- بابک امیری- علی مروسی | Vol. 190 2007 |