دوره 8، شماره 3 - ( 6-1397 )                   جلد 8 شماره 3 صفحات 2791-2781 | برگشت به فهرست نسخه ها


XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Soltanali H, Rohani A, Tabasizadeh M, Abbaspour- Fard M H, Parida A. Improving the performance measurement using overall equipment effectiveness in an automotive industry. ASE 2018; 8 (3) :2781-2791
URL: http://www.iust.ac.ir/ijae/article-1-432-fa.html
Improving the performance measurement using overall equipment effectiveness in an automotive industry. Automotive Science and Engineering. 1397; 8 (3) :2781-2791

URL: http://www.iust.ac.ir/ijae/article-1-432-fa.html


چکیده:   (20269 مشاهده)
Considering the present business competitive scenario, the automotive industry is under pressure to achieve higher productivity. A high level of performance and quality standard could be achieved through improving the Overall Equipment Effectiveness (OEE) of the equipment in an automotive industry. Thus, the aim of this study is to investigate the performance measurement through OEE theory in an Iranian automotive industry. Data and basic information collected from the Computerized Maintenance Management System (CMMS) of the production assembly lines. In this case study, two different assembly lines such Peugeot and Sports Utility Vehicle (SUV) were studied. The results indicated that the indices such availability rate, performance and quality for Peugeot assembly line obtained an OEE value of 0.99, 0.70 and 0.38, respectively, and, these indices for SUV assembly line obtained as 0.99, 0.39 and 0.53, respectively. Statistical analysis results of net operating time parameter for two assembly lines revealed that there is significant difference in the confidence level of 5% (P-value < 0.05). In addition, the OEE index for Peugeot and SUV assembly lines gained 0.27 and 0.21 over a period of one year. Consequently, to improve the OEE in the automotive assembly lines, managing the time losses by systematic planning of manufacturing and the implementation of Total Productive Maintenance (TPM) are suggested.
متن کامل [PDF 917 kb]   (5664 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: تست و استاندارد

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به مجله بین‌المللی مهندسی خودرو می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2025 CC BY-NC 4.0 | Automotive Science and Engineering

Designed & Developed by : Yektaweb