Kaveh A, Vazirinia Y. TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS. International Journal of Optimization in Civil Engineering 2017; 7 (3) :393-411
URL: http://ijoce.iust.ac.ir/article-1-305-en.html
Abstract:   (17392 Views)

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been solved by linear programming, but meta-heuristic methods spend less time to solving the problem. Hence, in this paper three newly developed meta-heuristic algorithms called CBO, ECBO, and VPS have been used to solve the tower crane locating problem. Three scenarios are studied to show the applicability and performance of these meta-heuristics.

Full-Text [PDF 616 kb]   (4928 Downloads)    
Type of Study: Research | Subject: Optimal design
Received: 2017/02/26 | Accepted: 2017/02/26 | Published: 2017/02/26

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Iran University of Science & Technology

Designed & Developed by : Yektaweb