[Home ]   [ فارسی ]  
Main Menu
SRE::
Railway Academy::
Education::
Research::
People::
Facilities::
News::
Subset::
Contact us::
::
Journal
AWT IMAGE
..
8th International Conference
..
Search in website

Advanced Search
..
Polling
How do you evaluate this site?
Excellent
Good
Average
Poor
   
..
About Iran

AWT IMAGE

..
:: resumeh.2 ::

AWT IMAGE

  Keivan Ghoseiri, Ph.D.

 

University:      Iran University of Science and technology

Faculty:          Railway Engineering

Department:   Railway Transportation Engineering

Phone:          (+9821) 7-749-1029, 30

Fax:              (+9821) 7-745-1568

Email:            ghoseiri@iust.ac.ir , keivan_g@yahoo.com

EDUCATIONS

 Ph.D. Systems and Industrial Engineering, Iran University of Science and Technology, Tehran, Iran. (1997 to 2003)

 Visiting Scholar/Researcher, University of Arizona, Tucson, Arizona, USA. (2001 to 2002)

 M.S. Systems and Industrial Engineering, Iran University of Science and Technology, Tehran, Iran. (1995 to 1997)

 B.S. Manufacturing Engineering, Iran University of Science and Technology, Tehran, Iran.(1991 to 1995)

 

PUBLICATIONS:

  Books

  1) Ghoseiri, K., and Ghannadpour, S. F., “Vehicle Routing problem with Time Windows”, Azad Univerity Publication, 2008

  2) Ghoseiri, K., and Jafarian, A. R., “An Introduction to the Fuzzy Data Envelopement Analysis”, Azad Univerity Publication, 2008

  3) Ghoseiri, K., and Norouzi A., “Information Technology Project management”, Dibagran Publishing, 2008

 

  Peer-reviewed journal papers 

  1) Ghoseiri, K., and Sarhadi, H., “ A Memetic Algorithm for Symmetric Traveling Salesman Problem”, International Journal of Management Science and Engineering Management, Vol. 3 (2008) No. 4, pp. 275-283

  2) Ghoseiri, K. and Ghannadpour, S.F. , “An Efficient Heuristic Method for Capacitated P-Median Problem”, International Journal of Management Science and Engineering Management, (2009) Vol. 4 , No. 1, pp. 0-8

  3) Ghoseiri, K., and Sarhadi, H., “ Finding a Minimal Hamiltonian Tour through a Selected Set of Iranian Points Using Hybrid Ant Colony System and Local Search Algorithm”, Journal of Transportation Research, 2009

  4) Ghoseiri, K. and Ghannadpour, S.F., “ Hybrid Genetic Algorithm for Vehicle Routing and Scheduling Problem”, Journal of Applied Sciences, 9(1): 79-87, 2009

  5) Ghoseiri, K. and Moghadam, A.R.J., “ Continuous Fuzzy Longest Path Problem in Project Networks”, Journal of Applied Sciences, 8 (22):4061-4069, 2008

  6) Sayarshad H.R. and Ghoseiri, K., “ A simulated annealing approach for the multi-periodic rail-car fleet sizing problem” , Computers & Operations Research 36 (2009)1789-1799, doi:10.1016/j.cor.2008.05.004

  7) Ghoseiri, K. and Ghannadpour, S.F., “Locomotive Routing in Rail Networks using a Hybrid genetic algorithm”, Journal of Transportation Research, 2008

  8) Ghoseiri, K., and Morshedsolouk F., “ACS-TS: Train scheduling Using Ant Colony System”, Journal of Applied Mathematics and Decision Sciences, Volume 2006, Article ID 95060, 1-28.

  9) Ghoseiri, K., and Morshedsolouk F., “ An Ant Colony System Heuristic for Train Scheduling Problem ”, Journal of Transportation Research, 2005, 257-270.

  10) Ghoseiri, K., Szidarovszky, F., and Asgharpour, M.J., “A Multi-Objective Train Scheduling: Model and Solution”, Transportation Science, Part B, Vol. 38 (2004) 927-952.

  11) Ghoseiri, K., Szidarovszky, F., and Asgharpour, M. J., “A Two-Person Conflict Model in Train Scheduling ”, International Game Theory Review, Vol. 5, No. 2 (2003) 105-125.

  12) Ghoseiri, K., and Jalilvand, F., “ Estimating Marginal Costs for the Infrastructure of Iranian Railway Network Using an Econometric Approach ”, Journal of Transportation Research, Vol. 4, No.2, 2007.

  13) Ghoseiri, K., “A New Idea for Train scheduling Using Ant Colony Optimization”, WIT Transactions on the Built Environment, Vol 88, 2006, WIT Press, 601-609

  14) Ghoseiri, K., and Pishdad S., “Service Quality Measurement in Information Technology Departments”, journal of Management Knowledge, Autumn 2006, Vol. 19, No. 74.

  15) Aliahmad, A. and Ghoseiri K., “A Group Multi-Criteria Decision Making Model to Choose Appropriate Level of Public Services”, Management Knowledge, Vol. 12, No. 46 fall 1999 .

  Conference papers 

  1) Ghoseiri, K. and Moghadam, A.R.J., “ Fuzzy Error Time in Completion Date of Projects ”, Proceedings of t he 9th Asia Pacific Industrial Engineering & Management Systems Conference ( APIEMS 2008) , pp. 467- 474, Nusa Dua, Bali – INDONESIA, December 3rd – 5th, 2008

  2) Ghoseiri, K. and Lessan, J., “Location Selection for Logistic Centers using a Two-Step Fuzzy-AHP and ELECTRE Method ”, Proceedings of t he 9th Asia Pacific Industrial Engineering & Management Systems Conference ( APIEMS 2008) , pp. 434- 440, Nusa Dua, Bali – INDONESIA, December 3rd – 5th, 2008

  3) Ghoseiri K., Fathipour F., and Nekouei Shahraki S., “Multiple Objective Crew Scheduling Using Fuzzy Goal Awarded Best Paper Award in the 10th International conference on Railway transportation, 2008, Tehran, Iran.

  4) Ghoseiri, K. and Ghannadpour, S.F., “Solving Capacitated P-Median Problem (CPMP) using Genetic Algorithm”, Proceedings of IEEE International conference on Industrial Engineering and Engineering Management, 2-4 Dec. 2007, Singapore, Page(s):885 - 889
DOI: 10.1109/IEEM.2007.4419318

  5) Ghoseiri, K. and Sarhadi, H., “A 2opt-DPX Genetic Local Search for Solving Symmetric Traveling Salesman Problem”, Proceedings of IEEE International conference on Industrial Engineering and Engineering Management, 2-4 Dec. 2007, Singapore, Page(s):903 - 906
DOI: 10.1109/IEEM.2007.4419322

  6) Ghoseiri K., Fathipour F., and Nekouei Shahraki S., “Measuring Rail Network Connectivity using Reliability Analysis of Infrastructures” 9th International conference on Railway transportation, 2007, Tehran, Iran

  7) Ghoseiri, K. Ghannadpour, S.F., and Askari Tehrani, H., “Locating Emergensy Medical Services in Urban Transportation Networks using Genetic Algorithm ” 5th International Conference of Industrial Engineering, July 2007, Tehran, Iran.

  8) Ghoseiri, K., “A New Idea for Train scheduling Using Ant Colony Optimization”, Tenth International Conference on Computers in Railways (COMPRAIL 2006), July 2006, Prague, Czech Republic.

  9) Ghoseiri, K., Varasteh F., and Khedmatlo S., “Connectivity Analysis of Iranaian Railway Network, International Conference on Chabahar, Transit and Eastern Corridor Development of Iran, Autumn 2007, Tehran, Iran.

  10) Ghoseiri, K., Javadian, N., and Sayarshad, H.R., “A Deterministic Multi-periodic Optimisation model in Rail Fleet Sizing”, 8th International conference on Raliway transportation, 2006 , Tehran, Iran.

  11) Ghoseiri, K., and Pishdad S., “Identification of Service Quality Dimensions of Iranian Railway’s Information Technology Department”, Awarded Best Paper Award in the 8th International conference on Railway transportation, 2006, Tehran, Iran.  

JOURNAL REVIEWER

 European Journal of Operational Research

Transportation Research Part B

 Journal of Transportation Research

 IEEE Transactions on Intelligent Transportation Systems

TEACHING EXPERIENCES

   Graduate:

  1. Transportation Network Optimization and Modeling

  2. Network Flows

  3. Multiple Criteria Decision Making

  4. Systems Dynamic: Analysis and Management

  5. Advanced Operations Research

  6. Information Technology Project Management

  7. Transportation Systems

  8. Fundamental of Railway Operations Engineering and Management

  Undergraduate:

  1. Operations Research

  2. Project Control and Management

  3. Systems Analysis and Design

  4. Inventory Control and Management

  5. Production Planning and Management

  6. Time Study and Work Measurement

  7. Plant Layout Design and Location

  8. Railway Planning

View: 6543 Time(s)   |   Print: 1829 Time(s)   |   Email: 144 Time(s)   |   0 Comment(s)
Related topics Related topics Print version Print version Send to friends Send to friends
کلیه حقوق مادی و معنوی این سایت متعلق به دانشکده مهندسی راه آهن دانشگاه علم و صنعت ایران می باشد. استفاده از مطالب آن با ذکر منبع بلامانع می باشد.
Persian site map - English site map - Created in 0.16 seconds with 55 queries by YEKTAWEB 4570